Well Completion and Workover (PRC-2)
Well Completion and Workover (PRC-2)
Papandayan Hotel, Bandung | August 12-14, 2009 | Rp. 5.250.000,-
OBJECTIVES
This course introduces the participants to the concepts of completions and workover designs. It introduces the participants to the common completion and stimulation methods and the associated oil field equipments.
COURSE CONTENT
1. Introduction
- Basic Terminology
- Introduction to Geology
- Well Planning
2. Well Planning
- Drilling
- Pay Section
- Initial Completion Design
3. Casing Design
- Completion the Pay Zone
- Casing String Design
- Liner Design and Tie-Backs
4. Cementing
- Properties of Typical Cements
- Cementing Design
- Primary Cementing
5. Packer Selection
- Packer Types
- Packer Selection and Tubing Forces
- Special Packers
6. Well Head, Chokes and SSSV?s
- Wellheads Subsea Wellheads
- Subsurface Safety Valves and Chokes
- Hydrate Control
7. Corrosion and Erosion
8. Inflow Performance and Artifical Lift
9. Perforating Guns and Design
WHO SHOULD ATTEND
Production and completion engineers, general petroleum engineers, reservoir engineers, operation engineers, geologist, geophysicists, supervisors, technical managers, and field foremen.
Instructor
Ir. Tutuka Ariadji, M.Sc, Ph.D/ Ir. Boedi Windiarto
Ir. Tutuka Ariadji, M.Sc, Ph.D
Ir. Boedi Windiarto has graduated from bachelor degree of petroleum engineering. To share his knowledge with other people, he leads in training and courses at several topics, such as: Gas Lift Operation for Optimize Production, Basic Drilling Engineering for Operation, Well Completion & Work over, Basic Reservoir and Drilling Engineering
Mr. Boedi is a team leader for a group of Schlumberger Engineers outsourcing. He was supporting production and reservoir for Marginal Field Wonocolo Pertamina Cepu.
Schedule
August 12-14, 2009
3 days
Venue
Papandayan Hotel, Bandung
Tuition Fee
Rp. 5.250.000,- per participant, excluding accommodation & tax